Please use this identifier to cite or link to this item: http://hdl.handle.net/1942/23267
Full metadata record
DC FieldValueLanguage
dc.contributor.authorWelkenhuysen, Kris-
dc.contributor.authorRupert, Jort-
dc.contributor.authorCOMPERNOLLE, Tine-
dc.contributor.authorRamirez, Andrea-
dc.contributor.authorSwennen, Rudy-
dc.contributor.authorPiessens, Kris-
dc.date.accessioned2017-02-28T13:33:13Z-
dc.date.available2017-02-28T13:33:13Z-
dc.date.issued2017-
dc.identifier.citationAPPLIED ENERGY, 185, p. 745-761-
dc.identifier.issn0306-2619-
dc.identifier.urihttp://hdl.handle.net/1942/23267-
dc.description.abstractThe use of anthropogenic CO2 for enhancing oil recovery from mature oil fields in the North Sea has several potential benefits, and a number of assessments have been conducted. It remains, however, difficult to realistically simulate the economic circumstances and decisions, while including the economic uncertainties that surround the relevant markets and policies, and the geological and technological uncertainties that are inherent to dealing with reservoirs and novel technologies in a challenging environment. A new method is proposed here introducing a unique combination of innovations, that include true limited foresight, project flexibility, and the consideration of realistic investment risk. The value of project is here expressed as the Net Present Value (NPV). These elements are combined in the PSS IV simulator. This is a techno-economic simulator for CO2-enhanced oil recovery (CO2-EOR), which applies limited foresight and Real Options Analysis to make realistic investment decisions on projects with significant uncertainties and thus risk. Consecutive project decisions are taken based on a decision tree. Multiple oil fields can be approached as a single cluster project, which can provide a lower investment hurdle. In a first test case for PSS IV, the Claymore and Scott oil fields are assessed, and it is shown that economic simulations where FOR projects are regarded as a sum of the individual field assessments will undervalue projects. Simulation results show that results are in a realistic range compared to published numbers, with individual project values for the Claymore field on average of 15.8 sic/barrel (bbl; standard deviation SD = 8.3) and for the Scott field of 14.3 sic/bbl (SD = 8.6). Due to the inclusion of uncertainties and the application of limited foresight, results range from -6 sic/bbl (loss) to over 30 sic/bbl. In a cluster configuration 5 sic/bbl of additional value is created. (C) 2016 Elsevier Ltd. All rights reserved.-
dc.description.sponsorshipThe Master thesis programme of the Energy Science program at Utrecht University made it possible to start the development of PSS IV. Part of the final development and the development of the case study were funded by the Scottish Carbon Capture and Storage CO<INF>2</INF>-EOR Joint Industry Project.-
dc.language.isoen-
dc.publisherELSEVIER SCI LTD-
dc.rights© 2016 Elsevier Ltd. All rights reserved-
dc.subject.otherTechno-economic modelling; CO2-enhanced oil recovery; Limited foresight; Uncertainty-
dc.subject.othertechno-economic modelling; CO2-enhanced oil recovery; limited foresight; uncertainty-
dc.titleConsidering economic and geological uncertainty in the simulation of realistic investment decisions for CO2-EOR projects in the North Sea-
dc.typeJournal Contribution-
dc.identifier.epage761-
dc.identifier.spage745-
dc.identifier.volume185-
local.format.pages17-
local.bibliographicCitation.jcatA1-
dc.description.notes[Welkenhuysen, Kris; Piessens, Kris] Royal Belgian Inst Nat Sci, Geol Survey Belgium, Jennerstr 13, B-1000 Brussels, Belgium. [Welkenhuysen, Kris; Swennen, Rudy] Katholieke Univ Leuven, Dept Earth & Environm Sci, Celestijnenlaan 200E, B-3001 Heverlee, Belgium. [Rupert, Jort; Ramirez, Andrea] Univ Utrecht, Copernicus Inst Sustainable Dev, Fac Geosci, Heidelberglaan 2, NL-3584 CS Utrecht, Netherlands. [Compernolle, Tine] Hasselt Univ, Ctr Environm Sci, Agoralaan Bldg D, B-3590 Diepenbeek, Belgium.-
local.publisher.placeOXFORD-
local.type.refereedRefereed-
local.type.specifiedArticle-
dc.identifier.doi10.1016/j.apenergy.2016.10.105-
dc.identifier.isi000390494600061-
item.fullcitationWelkenhuysen, Kris; Rupert, Jort; COMPERNOLLE, Tine; Ramirez, Andrea; Swennen, Rudy & Piessens, Kris (2017) Considering economic and geological uncertainty in the simulation of realistic investment decisions for CO2-EOR projects in the North Sea. In: APPLIED ENERGY, 185, p. 745-761.-
item.contributorWelkenhuysen, Kris-
item.contributorRupert, Jort-
item.contributorCOMPERNOLLE, Tine-
item.contributorRamirez, Andrea-
item.contributorSwennen, Rudy-
item.contributorPiessens, Kris-
item.validationecoom 2018-
item.accessRightsRestricted Access-
item.fulltextWith Fulltext-
crisitem.journal.issn0306-2619-
crisitem.journal.eissn1872-9118-
Appears in Collections:Research publications
Files in This Item:
File Description SizeFormat 
welkenhuysen 1.pdf
  Restricted Access
Published version2.16 MBAdobe PDFView/Open    Request a copy
Show simple item record

SCOPUSTM   
Citations

33
checked on Sep 3, 2020

WEB OF SCIENCETM
Citations

47
checked on Apr 30, 2024

Page view(s)

68
checked on Sep 7, 2022

Download(s)

48
checked on Sep 7, 2022

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.