Please use this identifier to cite or link to this item:
http://hdl.handle.net/1942/11908
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | JANSSENS, Gerrit K. | - |
dc.contributor.author | Phusavat, K. | - |
dc.contributor.author | Anussornnitisarn, P. | - |
dc.date.accessioned | 2011-05-10T09:39:13Z | - |
dc.date.available | NO_RESTRICTION | - |
dc.date.available | 2011-05-10T09:39:13Z | - |
dc.date.issued | 2010 | - |
dc.identifier.citation | Proceedings of the European Simulation and Modelling Conference 2010. p. 247-252. | - |
dc.identifier.isbn | 978-90-77381-57-1 | - |
dc.identifier.uri | http://hdl.handle.net/1942/11908 | - |
dc.description.abstract | Activities of a project often have random durations. This makes the estimation of the total project more difficult. Simulation, approximation and bouding techniques help the project manager in formulating these estimates. This paper focuses on formulating an upper bound on the project length based on the fact that an activity network can be represented as a stochastic marked graph. The bound, however, includes a part which requires that the distributions of the activity durations are fully specified. As many times, only incomplete information is available on these durations like the interval, the mean, the mode or the standard deviation, this research investigates how the bound should be computed including only incomplete information. | - |
dc.language.iso | en | - |
dc.publisher | Eurosis | - |
dc.subject.other | Project scheduling; random durations; Petri nets; stochastic marked graphs | - |
dc.title | On the completion time of a project with random activity durations on a model of stochastic marked graphs | - |
dc.type | Proceedings Paper | - |
local.bibliographicCitation.conferencedate | 25-27 October 2010 | - |
local.bibliographicCitation.conferencename | European Simulation and Modelling Conference 2010 | - |
local.bibliographicCitation.conferenceplace | Hasselt, Belgium | - |
dc.identifier.epage | 252 | - |
dc.identifier.spage | 247 | - |
local.bibliographicCitation.jcat | C1 | - |
local.publisher.place | Gent | - |
local.type.refereed | Refereed | - |
local.type.specified | Proceedings Paper | - |
dc.bibliographicCitation.oldjcat | C2 | - |
dc.identifier.isi | 000305812900039 | - |
local.bibliographicCitation.btitle | Proceedings of the European Simulation and Modelling Conference 2010 | - |
item.fulltext | With Fulltext | - |
item.fullcitation | JANSSENS, Gerrit K.; Phusavat, K. & Anussornnitisarn, P. (2010) On the completion time of a project with random activity durations on a model of stochastic marked graphs. In: Proceedings of the European Simulation and Modelling Conference 2010. p. 247-252.. | - |
item.contributor | JANSSENS, Gerrit K. | - |
item.contributor | Phusavat, K. | - |
item.contributor | Anussornnitisarn, P. | - |
item.validation | ecoom 2014 | - |
item.accessRights | Open Access | - |
Appears in Collections: | Research publications |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
janssenscompl.pdf | 705.3 kB | Adobe PDF | View/Open |
Page view(s)
18
checked on Aug 25, 2023
Download(s)
8
checked on Aug 25, 2023
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.