Title: On the completion time of a project with random activity durations on a model of stochastic marked graphs
Authors: JANSSENS, Gerrit K. 
Phusavat, K.
Anussornnitisarn, P.
Issue Date: 2010
Publisher: Eurosis
Source: Proceedings of the European Simulation and Modelling Conference 2010. p. 247-252.
Abstract: Activities of a project often have random durations. This makes the estimation of the total project more difficult. Simulation, approximation and bouding techniques help the project manager in formulating these estimates. This paper focuses on formulating an upper bound on the project length based on the fact that an activity network can be represented as a stochastic marked graph. The bound, however, includes a part which requires that the distributions of the activity durations are fully specified. As many times, only incomplete information is available on these durations like the interval, the mean, the mode or the standard deviation, this research investigates how the bound should be computed including only incomplete information.
Keywords: Project scheduling; random durations; Petri nets; stochastic marked graphs
Document URI: http://hdl.handle.net/1942/11908
ISBN: 978-90-77381-57-1
ISI #: 000305812900039
Category: C1
Type: Proceedings Paper
Validations: ecoom 2014
Appears in Collections:Research publications

Files in This Item:
File Description SizeFormat 
janssenscompl.pdf705.3 kBAdobe PDFView/Open
Show full item record

Page view(s)

18
checked on Aug 25, 2023

Download(s)

8
checked on Aug 25, 2023

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.